#4 Perryville, MO – Visual Sanitary Inspection Report

Perryville, Missouri’s City leaders said it has been about 15 years since the last scheduled maintenance was performed on the tower. Upon CIS inspection we have listed these recommendations

Sample Notations
  1. Relocate conduit and cables from side of ladder to comply with OSHA regulations
  2. Recommend the installation of stainless steel bolts in lieu of galvanized on riser manway to prevent future rusting and bolts seizing.
  3. Three (3) roof penetrations need to be closed off to prevent contamination of tank.